There are two main ways in which the deck is attached to the pontoon boat logs.
Pontoon deck bolts. By about 2012 the industry adopted 86 wide as the standard. With deck bolts you must drill a hole for the shaft of the bolt. 1 round flat head will not protrude into your pontoon boats carpet.
Place your new deck bolt through the newly drilled hole and proceed to the underside of the boat to secure the bolt. Use these extra long pontoon deck fasteners on Crest Pontoon Boats or any boat that requires extra long bolts. Both are just as popular as each other however they both have the pros and cons.
3 E-Bolts are required on Crest Pontoons. Decking is attached to logs by either being bolted on or screwed on. You will want to space the hardware approx 12 - 16 apart.
100 3 zinc plated elevator bolts with 1 washers and flange nuts. Used to secure railing to the deck Stainless steel 35 x 25 Stainless Steel Bolts Stainless Steel Washers Lock Nuts. Pontoon Round Corner Cap.
JIF Pontoon Fence Bolt Kit 26 per pack Features Specs. Use these extra long pontoon deck fasteners on Crest Pontoon Boats or any boat that requires extra long bolts. Space these holes approx.
Pre-drill your decking and cross channels with a 14 drill bit. Pontoon Deck Trim 8. Elevator bolts are flat on the top drill the deck slide in the E-bolt and have someone under the deck tighten the nut.