Drive stakes in the ground that are at a height level that represent the limit for gravel through the area.
Level ground for pavers. Determine your location and remove any large rocks or debris. Add or take away soil until the. Place 2x4s on the site and place a level on top.
Measure the ground accurately before starting the excavation of the area. All you’re going to need is a flathead screwdriver (if you have two, even better), a rubber. This is fill dirt that doesn’t contain any.
You’ll see how to calculate the volume of road base fill you’ll need. Learn how to lay road base and prepare and area for paving. To ensure your pavers are lined up perfectly, be sure the land is level.
Remember that all height references are. Add up the heigh of the pavers plus 4 inches of gravel and 3 inches of sand. Leveling the land requires you to use clean fill dirt.
Leveling the ground ensures pavers are corr. 10 × (1÷80) = 10 × 0.0125 = 0.125m = approx 125mm higher than the gully at k. Check the top of the sand for levelness with the carpenter's level, and move sand as needed until the top of the sand is level.
No one wants to trip on uneven paving stones, but they will be uneven if the ground underneath them is not level. Tamp the sand with a hand tamper to flatten it. The ground should be level for pavers to drain, but with a slope of 1 inch to every 4 feet in length, to.