How to level an above ground pool on a slope. Then lay out the drain tile, and slip the 6 sleeve over. In order to install an above ground pool on a slope, dig down to create a flattened, level area. How an above ground pool is leveled.
So, if the track is. It’s easier when you know exactly where the pool is going and. The only thing you have to level with any pool if the top rails.
Mark the perimeter of the area to be leveled. If the pool is full with water, drain it. Locate the blocks for leveling on the lower area of the pool and pull all of.
To save water, stop draining at halfway the level of the pool capacity. Youll need to dig away these area in order to create level ground for the pool.advertisement. Tie a spray paint can to the other end of the string.
A tip for the sleeve. If you plan on constructing a pool on a steep slope, consider installing a pool that works best with the terrain. So level the legs with pavers.
Next, identify the lower and higher sections of the spot. Using a level, mark all the high spots in the yard with stakes. First, you need to drain the water from your pool halfway.