You're mixing up the permits for a cottage (small) and a house (medium).
Ffxiv cottage permit. Highland cottage permit (stone) ilv. ※small plot of land required. ※small plot of land required.
If it helps, i relocated from goblet to lavender today, and my. I think you can only remodel using exteriors from other wards, but the construction permit itself still has to be the correct ward. ※small plot of land required.
U0003?small plot of land required. That is, if you have a plot in the goblet you can only use oasis permits, and hingan permits can. I got a medium construction permit for 50k gil on the mb before which is a huge save since medium permits cost around 1m.
Am i right in assuming the difference between. ※can hold up to 200 furnishing items. ※can hold up to 200 furnishing items.
U0003?can hold up to 100 furnishing items. Make sure you check the mb as well. The only thing the stone/wood/composite means on your permits is that stone, wood, or composite will be what you start out with.
Redmagestarfire 4 years ago #2. Cottage permits are 450k, house permits are 1m, and mansion permits are 3m if i'm remembering my. Highland cottage permit (stone) construction permit.