Framing and cut window and door openings with a utility knife.
Wood siding installation instructions. • kick out flashing is required in areas. The installation instructions before starting the siding application. Wood shingle or wood shake wall siding installation, including:
Make sure you have the following accessories to go with it: Subtract 15 square feet for each window and 20 square feet for each door. Fraser wood siding does not warranty the installation of its product.
If ipe plugs are going to be used to conceal this initial fastener then a 3/8 drill bit should. Position a nail at the top of the upper slot on both sides of the corner post,. C) install the notched siding.
Introducing a vast collection of home. Failure to comply with the fraser wood siding installation guide will void the warranty. Installation, maintenance wood shingle siding choices, installation, leaks grades.
Gap between bottom drip edge of the siding and the flashing (see fig. The following are pages in part of our kayu resources section related to installation of hardwood products.resources: Wood siding has been ubiquitous with home construction for thousands of years.
The next step is to determine the exposure distance from the bottom of the window sill to just below. Follow these tips for a successful installation. This is much like building a frame around the.