To save water, stop draining at halfway the level of the pool capacity.
Level ground for above ground pool. Place 2×4 planks from the center of the pool site to the outer edge, using as many planks as needed to reach the border. Next, identify the lower and higher sections of the spot. If the pool is full with water, drain it.
1 why your pool needs even level the ground. Following that, you can start to lift the pool. After you’ve let the sand come to rest, it needs to be compacted into a solid base for your pool.
How to level the ground for an above ground pool step 1: 1.1 the water level will be irregular. From here, take out your shovel and dig up the high spots.
It's works really well and surprisingly easy. How to level an above ground pool on grass. This keeps all blocks at the same level.
Now we come to the point of how to level the entire bottom track area of the pool. This also shows how to level gro. 1.3 the ground pool will look wrong.
Since there is so much weight on the wall, this is a vital step. Take note of the water level. We show what we did to level out the ground for an above ground swimming pool.