Always roll back to starting point to prevent stretching the wall base.
Johnsonite wall base care and maintenance. About johnsonite millwork wall finishing system. Johnsonite traditional vinyl 1/8 (type. Millwork gives you the rich look of finely milled wood, at about half the.
Use a clean white cloth dampened. If deemed necessary, an acrylic floor finish can be. Maintenance 72 hours after installation is completed, initial maintenance procedures must be implemented in accordance with manufacturer's requirements.
Carefully position the wall base on the wall surface and roll with a small hand roller. Click pictures below for additional information.