To level the ground for installing an above ground pool, mark out the area where the pool is going plus one foot, remove the grass/sod, determine the grade of the site, then level.
How to level an above ground pool. We show what we did to level out the ground for an above ground swimming pool. With the help of the shovel, pry the wall up from the base connector. Next, identify the lower and higher sections of the spot.
Take a measurement of the water. Dig out the sod and level the dirt with a shovel or rake. Dig up the foundation to show the leveling blocks underneath.
This is the track that the pool’s wall fits into. Lay the pool's bottom rails and sink square pavers underneath them. To save water, stop draining at halfway the level of the pool capacity.
Traditional above ground swimming pools are leveled at their bottom track. Mark the perimeter of the area to be leveled. Youll need to dig away these area in order to create level ground for the pool.advertisement.
Tie a spray paint can to the other end of the string. Locate the blocks for leveling on the lower area of the pool and pull all of. Fill in the gaps with sand and tamp the sand down.
This also shows how to level gro. Water it down with a hose to make sure that it’s packed in there good. Dig out the higher slopes.