Sometimes the transitions we need are the wrong ones or they need to be special ordere.
How to install t mold transition strip. How to install transition strips on concrete measure out the area as needed. Insert plastic plugs/dowels into the holes. Position the sample t mold in the door way where the final position volition be.
Step 1 transition strip (t molding) measure the exact width of the doorway using a tape measure. In the first step, we should start. It is easy to cut with the electric saw and install it in the middle of the largest space between the floors.
Lay down the vinyl planks and use a screwdriver to secure them. Use a modest piece of the t mold equally a guide. Make a mark through the holes.
Add a comment step 2 mark the t molding based on the doorway measure. Hold the track in place where the t mold will be. It is easy to cut with the electric saw and install it in the middle of the largest space between the floors.
Marking the holes on the concrete. How to install vinyl molding transition strips Durable and withstands heavy traffic.
Drilling the holes into the concrete.