Once the gravel is laid and spread out, add 3 inches of sand.
Best way to level ground for pavers. You can use rope, spray paint, or a garden hose to outline your project. Place two level pieces of metal pipe flush with the top of the sand base. Slide the carpenter's level along the string all the way around the rectangle.
Place 2x4s on the site and place a level on top. In the most drastic cases, a good amount of pavers will have to be lifted, so assess the state of your installation before and prepare accordingly. Drive stakes in the ground that are at a height level that represent the limit for gravel through the area.
To finish this step, clean all the faces of the. This is all dependent on your base materials and paver. A seattle paver contractor, like seattle outdoor spaces, can help advise you on the best bedding sand for your paver patio.
The less water you bring into contact. This will help to prevent the growth of unwanted plants and insects. Gravel should typically be layered 4 inches thick.
Add or take away soil until the. Add about eight inches around the perimeter for. Remember that all height references are.
Determine your location and remove any large rocks or debris. The ground should be level for pavers to drain, but with a slope of 1 inch to every 4 feet in length, to. Measure the area in which you want to add your patio.